A wood fence is priced by how much lumber goes into it and how long it takes to build. All of Regal Fencing's wood fencing is decay-resistant cedar. So on our quotes, wood fence cost and cedar fence cost are the same question.
Footage is the base. Jackson Vann, our owner and estimator, measures the fence line in linear feet at a free on-site estimate. Corners, ends and gate openings are counted along the way.
Height multiplies the footage. A 100 ft run at 6 ft has 600 sq ft of boards on each side, and at 5 ft it has 500 sq ft. Your city or HOA usually sets the ceiling.
Style is where 2 fences of the same size part ways. We build 7 cedar styles: flat top, dog ear, board on board, spaced picket, horizontal, cap and trim and lattice top. The table below shows how each one changes the lumber and the labor.
Posts are a choice, not a given. Regal sets fence posts 24 to 36 inches deep, so ask what footing depth your written quote includes. Ask about our free steel posts too.
Cedar is sold in grades, and the grade changes both the look and the price. Ask which grade is in your written quote. Ask to see a board too.
Gates add hardware and labor. A walk gate adds the least, and a double gate wide enough for a mower or trailer adds more.
A cedar fence replacement has one more line: the old fence. Pulling the boards, rails and posts and hauling them away is crew time. Tell us whether the old fence stays or goes so the written price covers it.
Your HOA can write part of the spec. The Highlands Ranch Community Association requires rough-sawn cedar, 5 or 6 ft tall, with a top cap. It also requires approval before any replacement with new material.
Stain is the last line. Staining protects wood from Colorado sun and weather, and Regal stains fences as well as building them. Ask for the stain to be priced with the fence so both are on one estimate.
If the fence is mostly sound, price a repair first. We fix leaning posts and storm damage for much less than a new fence. Jackson will tell you honestly which one your fence needs.
Once you approve the price, most installs take 1 to 2 days. Regal requests the Colorado 811 locate before digging, and any sprinkler line we damage during the install is fixed for free.
What changes the cost of a cedar fence?
| Cost factor | What changes the price | How Regal measures it |
|---|---|---|
| Length | More feet means more posts, rails and pickets | Measured on site in linear feet |
| Height | A taller fence uses more cedar per foot | Set by your city, your HOA and how much privacy you want |
| Style | Overlapped boards, caps, trim and lattice add lumber and labor | Chosen from our 7 cedar styles |
| Cedar grade | Grade changes the look and the price of the boards | Ask Jackson which grade he is quoting |
| Posts | Wood or steel posts, and the number of corners and ends | Counted along the line. Ask about our free steel posts |
| Gates | Each gate adds hardware and labor. A double gate adds more than a walk gate | Counted and sized by opening |
| Old fence removal | Tear-out and haul-off add crew time and disposal | Measured in feet of old fence |
| Slope, rock and access | Hard digging and long carries slow the crew | Checked by walking the line |
| HOA spec | A required cap, height or stain color adds to the scope | Checked against your HOA's guidelines before pricing |
| Staining | Stain is extra material and labor | Priced as its own line on the same estimate |

How do the 7 cedar fence styles compare on cost?
| Style | How it is built | Effect on price | Privacy |
|---|---|---|---|
| Flat top | One row of pickets cut square across the top | Among the simplest to build | Solid |
| Dog ear | One row of pickets with the top corners clipped | Among the simplest to build | Solid |
| Board on board | Two overlapping layers of pickets | Uses more pickets than a single row | Solid, with no gaps as boards shrink |
| Spaced picket | Pickets set with gaps between them | Uses fewer pickets per foot than a solid row | Open |
| Horizontal | Boards run side to side between posts | Usually costs more than a standard vertical fence | Solid or gapped, by design |
| Cap and trim | A cap board along the top with trim boards | Adds the cap, the trim and the labor to fit them | Solid |
| Lattice top | A lattice panel above the pickets | Adds the lattice and its framing | Solid below, open at the top |
How many square feet of cedar is in a fence run?
| Fence run | At 4 ft tall | At 5 ft tall | At 6 ft tall |
|---|---|---|---|
| 100 ft | 400 sq ft per side | 500 sq ft per side | 600 sq ft per side |
| 150 ft | 600 sq ft per side | 750 sq ft per side | 900 sq ft per side |
| 200 ft | 800 sq ft per side | 1,000 sq ft per side | 1,200 sq ft per side |